教你五招不會(huì)選錯(cuò)匯線橋架
教你五招不會(huì)選錯(cuò)匯線橋架
2.荷載核算:核算匯線橋架主干線縱斷面上單位長(zhǎng)度的電纜分量。
Teach you five strokes, never choose the wrong line bridge.
匯線橋架作為布線工程的一個(gè)配套項(xiàng)目,由于目前尚無(wú)專(zhuān)門(mén)的規(guī)范指導(dǎo),各生產(chǎn)廠家的標(biāo)準(zhǔn)類(lèi)型又缺少通用性,為了到達(dá)用戶滿意的產(chǎn)品規(guī)范咱們必須同客戶肩并肩地共享經(jīng)歷、信息、許諾、方針,以合作關(guān)系開(kāi)發(fā)優(yōu)異產(chǎn)品。
As a supporting project of wiring project, the bridge of Hui line is lack of specifications and guidance, and the standard type of each manufacturer is lack of universality. In order to reach the customer's satisfaction, we must share experiences, information, promises, policies with customers side by side, so as to develop excellent products in a cooperative relationship.
1斷定方向:依據(jù)修建平面布置圖,結(jié)合空調(diào)管線和電器管線等設(shè)置狀況,便利修理,以及電纜路由的疏密來(lái)斷定匯線橋架的佳路由,在室內(nèi),盡可能沿修建物的墻、柱、梁及樓板架起,如需使用綜合管廊架起時(shí),則應(yīng)在管道一側(cè)活上方平行架起,并考慮引下線盒分支線盡量防止穿插,如無(wú)其他管架借用,則需自建立(支)柱。
1. Determine the direction: According to the plan of the building, combined with the air-conditioning pipeline and electrical pipeline settings, convenient repair, as well as the density of cable routes to determine the best route of the junction line bridge, indoors, as far as possible along the building walls, columns, beams and floors erected, if need to use integrated pipe gallery erection, should be in the pipeline One side should be erected in parallel with the upper side, and the branch line of the lead-down box should be considered to prevent the insertion as far as possible. If no other pipe rack is borrowed, the post should be set up by itself.
2.荷載核算:核算匯線橋架主干線縱斷面上單位長(zhǎng)度的電纜分量。
2. load Accounting: calculate the cable length of the length of the main line of the bridge.
3.匯出匯線橋架平、剖面圖,部分部位還應(yīng)匯出空間圖,開(kāi)列資料表。
3. remit the flat and section drawings of the transmission line bridge. Some parts should also export the space map and list the data.
4.斷定安裝方法:依據(jù)場(chǎng)所的設(shè)置條件斷定橋架的固定方法,挑選懸吊式、直立式、側(cè)壁式或是混合式,連接件和緊固件一般是配套供給,此外,依據(jù)橋架結(jié)構(gòu)挑選相應(yīng)的改版。
4. Determine the installation method: According to the setting conditions of the site to determine the fixing method of the bridge, select suspension, vertical, sidewall or mixed type, connectors and fasteners are generally matching supply, in addition, according to the bridge structure to select the corresponding revision.
5.斷定橋架的寬度:依據(jù)布放電纜條數(shù)、電纜直徑及電纜的距離來(lái)斷定匯線橋架的類(lèi)型、標(biāo)準(zhǔn),托臂的長(zhǎng)度,支柱的長(zhǎng)度、距離,橋架的寬度和層數(shù)。
5. Determine the width of the bridge: According to the number of discharge cables, cable diameter and cable distance to determine the type of bridge, standard, arm length, the length of the pillar, the width of the bridge and the number of layers.
濟(jì)南航豐實(shí)業(yè)有限公司,對(duì)山東電纜橋架感興趣的朋友可以關(guān)注我們http://qdxiaosheng.com,更多精彩內(nèi)容知識(shí)敬請(qǐng)期待
Jinan Hanfeng Industry Co., Ltd., friends interested in Shandong cable bridge can pay attention to our http://qdxiaosheng.com, more exciting content knowledge please look forward to